Hot, Warm, or Cold Site: How Fast Can Operations Resume?
Recovery sites trade cost for readiness and recovery speed.
Hot site
Provides the greatest readiness, potentially including equipment, connectivity, configured systems, and rapidly available data.
Warm site
Provides intermediate readiness, with some infrastructure available but additional setup or restoration still required.
Cold site
Provides a facility and basic infrastructure but relatively little preconfigured technology, producing slower recovery at lower ongoing cost.
Connect to RTO
A very short recovery-time objective generally requires a more ready recovery strategy than a cold site alone.
The takeaway
Hot is fastest and most expensive. Cold is cheapest and slowest. Warm sits between them.
Related Summit guides
FAQ
Which site usually provides fastest recovery?
Hot site.
Which usually costs least to maintain?
Cold site.
Does site choice depend on RTO?
Yes.